• Land Loading Arm Al1412r for Tank Truck Loading System
  • Land Loading Arm Al1412r for Tank Truck Loading System
  • Land Loading Arm Al1412r for Tank Truck Loading System
  • Land Loading Arm Al1412r for Tank Truck Loading System
  • Land Loading Arm Al1412r for Tank Truck Loading System
  • Land Loading Arm Al1412r for Tank Truck Loading System

Land Loading Arm Al1412r for Tank Truck Loading System

After-sales Service: Guide Installation and Technical Disclosure
Warranty: 1
Condition: New
Customized: Customized
Certification: ISO9001
Tank Marerial: Metal Tank
Samples:
US$ 6600/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory, Trading Company
Gold Member Since 2023

Suppliers with verified business licenses

Jiangsu, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Quality Assurance
The supplier provides quality assurance
R&D Capabilities
The supplier has 3 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (20)
  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Our Advantages
Overview

Basic Info.

Model NO.
L1
Type
High Pressure Storage & Transportation Equipment
Storage Objects
Liquid, Gas
Places Applied
Top Open Loading
Applications
Product Oil, Chemicals
Working Pressure
Pn1.0~Pn4.0
Material of Pipeline
Carbon Steel, Stainless Steel, Aluminum, Low-Tempe
Transport Package
Cartons
Specification
5-100m
Trademark
LINGAO
Origin
China
Production Capacity
1000 Sets

Product Description

Product Description

 

The general introduction for land loading arm:
 

Our land loading arm is especially designed for transporting fluid between piping system and tanker, which shall be designed for different tanker, liquids and site conditions.
Equipped with loading platform, folding stairs and safety cage to make the land loading arm into a complete loading system.
By level location or quantitative monitoring, while fluid level exceed the present value, provide the sound and visual alarm or the remote signal.

According to the products, models and requirements of customers, the operating modes could be manual, pneumatic or hydraulic etc.
Detailed Photos

 

Land Loading Arm Al1412r for Tank Truck Loading SystemLand Loading Arm Al1412r for Tank Truck Loading SystemLand Loading Arm Al1412r for Tank Truck Loading System
Packaging & Shipping

 

Land Loading Arm Al1412r for Tank Truck Loading SystemLand Loading Arm Al1412r for Tank Truck Loading System
Our Advantages

We has independent property rights of standardized machining plant 5600 , covering an area of more than 10,000 ,we have a team with 20 years of design and production experience and the existing high-tech special equipment more than 30 sets, we are major in aluminum dome, steel dome, space triangular mesh shell, fully connected liquid floating roof, Loading arm, Glass Fused to Steel Tanks and other petrochemical equipment. Our products are exported all over the world for several chemical projects, environmental protection projects, and according to customer needs to provide a full range of professional technical support and troubleshooting solutions, our quality and service by domestic and foreign customers.
 

FAQ

Q1: Are you manufacturer ?
A: Yes,We are manufacture since from 2006, is a well-known company with good reputation in China even Asia.


Q2: What certification do you have? What's your standard?
 A:Yes ,We have ISO certification. Our standard is IAF, CNAS China GB.

Q3: What's the delivery time for the production?
 A:About 30 working days after receipt of deposit and confirmation of the order.

Q4: What's your payment term?
  A:we usually use 30% T/T deposit + 70% T/T before loading the container.

Q5: What's your Pre-sale and after-sales service?
 A:First,we provide detailed product technical evaluation and technical solutions according to customer needs, and provide detailed technical                  drawings,    engineering cost and project overview after the solution is confirmed.

   Second,Start production after technical disclosure, pre-installation, testing, packaging and delivery after completion

   Third,Provide installation training and guidance to customers

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001